Turkey-Ankara: IPA – Construction OF Elbistan Wastewater Treatment Plant and Wastewater Collection System

« View all Tenders

Turkey-Ankara: IPA – Construction OF Elbistan Wastewater Treatment Plant and Wastewater Collection System
Buyer Name: Ministry of Environment and Urbanization
Sector: Construction
Tender Link: https://ted.europa.eu/udl?uri=TED:NOTICE:221111-2019:TEXT:EN:HTML&src=0
Location: Turkey
Opening Date: 14-May-2019
Closing Date: 20-Aug-2019
Closing Time: 17:00 GMT +3

The contract will include 2 (two) lots.
The main works to be carried out are as follows:
For Lot 1: Construction of Elbistan Wastewater Treatment Plant

— design and build of approximately 23 000 m3/d average flow rate capacity wastewater treatment plant with activated sludge plant for nitrogen and phosphorus removal. Sludge stabilization shall be accomplished within the anaerobic digesters,

— design and build of approximately 250 m, 1 200 mm diameter reinforced concrete collector,
— 24 months supervision of operation after taking over (defects notification period),
— The work will be implemented under FIDIC Conditions of Contract for Plant and Design-Build (FIDIC Yellow Book — First Edition 1999).
For Lot 2: Construction of Elbistan Wastewater Collection System
— construction of approximately 33 km of wastewater collectors, river crossings, approximately 860 manholes and 615 parcel manholes,
— the work will be implemented under FIDIC conditions of contract for construction for building and engineering works designed by the employer (FIDIC Red Book — First Edition 1999),
— 12 months supervision of operation after taking over (defects notification period).